Three stages for a long repair list

Get a staged plan

The plan, stage by stage

Here is how a typical list from a Yorba Linda house sorts out once we have looked at it. The order comes from one question: what could cause a fire, let in an animal or let in water, and how soon?

  • Stage one, before anyone lights a fire: clear nests and debris, fit a screened cap to an open flue, make the damper work, deal with any flue tile damage the camera found.
  • Stage two, before the rainy months: stop active leaks at the flashing, add a cricket behind a wide stack, seal or rebuild a crown that is letting water in.
  • Stage three, planned when it suits you: repointing worn brick, waterproofing, relining an old flue, or switching to a gas insert if you would rather stop burning wood.

Why the critter items come first

On the reports we see, the most urgent items are often the cheapest. A flue packed with twigs or bedding is fuel sitting where the fire goes. An uncapped top lets the next animal straight back in after a sweep. These go first because they are the ones most likely to cause harm, and because doing them first protects the money spent on later stages.

A damper that will not shut belongs here as well. Animals bend them climbing past, and an open damper lets warm air, insects and noise into the house all year.

How the later stages are priced

Where our site lists a price for the fix, the plan quotes it. That covers caps, leak repair at the flashing, crickets, crickets combined with new flashing, gas inserts and the camera inspection. Crown work, relining, damper replacement, chase covers and flashing on its own vary too much to publish, and get a written figure from us once we have measured.

Nothing in stage two or three has to be booked on the day. You get the plan in writing, decide what to do and when, and we come back for each stage as you approve it.

Prices for common staged fixes

These are our published installed prices for the fixes that turn up most on a failed report. Everything else on your list is written up with its own figure. The cap, last in the table, is quoted after we measure.

Peaked diverter on the high side of the stack
$450 to $1,015
Diverter and all-new metal at the roof joint
$675 to $1,650
Locating and stopping water at the chimney
$560 to $3,350
Camera check of the flue before or after repairs
$395
Switching a wood firebox over to a gas burning unit
$2,800 to $5,600
Screened lid to keep animals and rain out of the flue
Quoted after we measure

Ranges depend on the size of the chimney, how many flues it has and how hard the roof is to work on.

Staged repair questions

Can you work from a report someone else wrote?

Yes. We read it, look at the chimney ourselves to confirm the findings and then build the staged plan. Sometimes we find less than the report suggests, sometimes more, and we say which.

Is stage one always the expensive part?

Usually the reverse. Nest removal, a sweep and a cap are among the smaller items, and they head the list because of the risk, not the cost.

What if I only want to fix what a buyer asked for?

That is fine. We can price just the items in the buyer's request and leave the rest of the plan on file for later.

Does a staged plan cost extra?

The plan comes with the visit. You pay for the inspection and for whichever repairs you choose to go ahead with.

Can we stop burning wood instead of doing the flue repairs?

For some houses that is the sensible choice. A gas insert runs on its own liner, and the plan shows which stage one items still apply if you go that way.

Holding a report with a long list?

Send the address and a short note on what the report found through the contact page. We will come and look, then hand you the list in stages.